Tidewater Home Improvement LLC
Scope of Work & Estimate
106 Eric Nelson Run, Yorktown, VA 23693
Estimate #1417
$5,456.23 Crawlspace Structural Repair · 50/50 payments
106 Eric Nelson Run, Yorktown, VA 23693
Crawlspace Structural Repair · 26 LF Triple 2x10 Beam · 10 Sistered Joists · 2 Joist Hangers
View PDF — Estimate #1417 Accept & Pay Deposit View All Project Photos Estimate valid until 10/02/2026
Project Overview
Customer: Neil/James Moss
Project: Crawlspace Structural Repair
Address: 106 Eric Nelson Run, Yorktown, VA 23693
Estimate #: 1417
Date: 09/25/2026
Area of work: crawlspace floor framing — main beam span & 10 joists
Included Scope of Work
  • Beam Install — 26 LF, Triple 2x10A triple 2x10 beam (three plies, carried in 16 ft sections) is installed at the main span — 26 linear ft of support beam under the floor framing, where the joists are over-spanned and the floor has carried a heavier load than it was built for. This work stabilizes the floor structure; the floors are not being brought to level.
  • Sister Joists — 10 JoistsTen floor joists (2x8 x 14 ft — 140 linear ft total) are sistered to the existing framing to stiffen and stabilize the floor above.
  • Joist HangersTwo joist hangers are installed at the beam connection to carry the joist ends.
  • General ConditionsMobilization, protection of the work area, material runs and daily clean-up through the project.
Project Total$5,456.23
Site Photos — Before Work
Payment Schedule
Deposit to Schedule
$2,728.11
Upon signing
Final Payment
$2,728.12
Upon completion
Total Project Cost: $6,062.48 · 10% Customer Discount: −$606.25 · Total: $5,456.23 · Check is a preferred method · Pay by credit card: request.plastiq.com/pay-tidewater-home-improvement-llc (Virtual Affirm credit card not eligible)
Terms & Conditions

Scope: install 26 linear ft of triple 2x10 support beam (three plies, 16 ft sections) at the main beam span; sister 10 floor joists (2x8 x 14 ft — 140 linear ft) to the existing framing; install 2 joist hangers at the beam connection; general conditions for the structural repair.

Notes: no floor lifting or leveling is performed on this project — the beam and joists stabilize the existing floor framing. Contractor is not responsible for damage caused inside the home while repairing the foundation.

Warranty: 12-month workmanship on the structural repair; 2-year stabilization guaranteed.

Not included: vapor barrier, encapsulation, dehumidifier or drainage work; crawlspace cleanup or debris removal; gutters or downspout work; any repair to flooring, paint or finish surfaces; any work not listed in the scope above.

Payment: Total Project Cost $6,062.48 · 10% Customer Discount −$606.25 · Total $5,456.23 · Deposit to schedule $2,728.11 · Final payment $2,728.12.

Validity: valid until 10/02/2026.